UK Data Centre Design: BREEAM Certification and Part L Compliance Considerations
Data Centre — ASDV Consultant

UK data centres face extremely high and constant energy density, a strong expectation of sustainability certification, and a statutory energy compliance regime (Part L) not originally written with data halls in mind.

BREEAM's role for data centres. BREEAM assesses data centres under the BREEAM Other Buildings family, evaluating energy, water, materials, waste, pollution, land use and management, contributing credits to an overall rating (Pass to Outstanding). The Energy category typically carries the heaviest weighting given the building type's intensity, where PUE target and cooling efficiency have the most influence.

Part L and the data centre problem. Part L's methodology was developed around conventional occupied building types, and data centres — with IT load dominating consumption — sit awkwardly within it. In practice, compliance focuses on non-IT building services (office/support areas, fabric, base-build plant efficiency), while IT load sits outside Part L's direct scope but very much within BREEAM's Energy category.

Cooling and PUE as the dominant design lever. UK climate, with meaningful hours per year suitable for free cooling via air economisation, makes this genuinely effective compared with hotter climates. Hot/cold aisle containment and IT equipment inlet temperature strategy aligned with ASHRAE guidelines all contribute to PUE performance.

Metering, monitoring and the BMS. Both BREEAM and good practice require granular energy metering — sub-metered by mechanical, electrical, IT load and per-tenant — feeding a monitoring platform capable of calculating and reporting PUE on an ongoing basis.

BREEAMPart L
StatusVoluntary, client/investor-drivenStatutory
ScopeWhole facility including IT-supporting infrastructurePrimarily building fabric and non-IT services
Key metricCategory credits (Pass to Outstanding)Target Emission Rate vs Notional Building
Data hall/IT load treatmentDirectly assessedLargely outside direct scope
Driven byInvestor ESG requirements, planning conditionsStatutory Building Regulations approval

Common mistakes

The most common gap is treating BREEAM as a bolt-on assessment conducted after the engineering design is fixed, rather than a set of credit targets shaping cooling strategy from concept design onward. A second issue is confusing Part L compliance with a client's PUE or BREEAM Energy target.

Future outlook

We expect increasing regulatory attention on data centre energy consumption given the sector's rapid growth to support AI and cloud workloads, and embodied carbon growing in weighting as operational efficiency improvements plateau.

Frequently Asked Questions

No, it's voluntary, but frequently required as a condition of planning permission or mandated by investors as part of ESG commitments.
Not directly — Part L's methodology focuses on building fabric and conventional services, though cooling infrastructure serving the data hall remains subject to compliance.
No single statutory target, but well-designed modern facilities using free cooling and aisle containment routinely target figures meaningfully better than older-generation benchmarks.
Achievable but demanding, requiring strong performance across energy, water, materials, waste and management categories simultaneously, committed to from earliest design stages.
The UK's relatively cool climate allows extensive free and evaporative cooling for much of the year, reducing mechanical refrigeration reliance compared with hotter climates like the Gulf.