Commissioning Process Overview
Structured commissioning verifies system design and installation:
- Pre-commissioning inspections
- Factory acceptance testing (FAT)
- Site acceptance testing (SAT)
- Performance verification
- Documentation and sign-off
Factory Acceptance Testing (FAT)
Equipment and systems are tested before delivery to site:
- Equipment functional testing
- Control system logic verification
- Software validation
- Configuration verification
- FAT report and sign-off
Site Acceptance Testing (SAT)
Installed systems are tested to verify proper operation:
- Structured cabling certification
- Network connectivity verification
- System integration testing
- Performance benchmarking
- Load and stress testing
Functional & Performance Testing
Specific tests verify system capabilities:
- ELV Systems: Power, signal, control testing
- ICT Systems: Network bandwidth, latency, reliability
- Fire Systems: Detection, alarm, evacuation
- Security Systems: Access, monitoring, response
- Integration: System inter-operability
Documentation & Handover
Comprehensive documentation supports ongoing operations:
- As-built documentation and drawings
- Equipment manuals and warranties
- Test reports and compliance certificates
- Operational procedures and training
- Maintenance schedules and contacts
Authority Approvals
Systems must receive authority approvals for occupancy:
- Civil Defense fire system approval
- Building Safety Department inspection
- Occupancy permit conditions
- Defect remediation and re-testing
- Final approval and handover