🇬🇷 Data Centre & Technical Facilities

Data Centre ELV & ICT Design
for Greece Facilities

Athens is Greece's main data centre hub, with most operating facilities and the largest upcoming pipeline. Power availability sets the schedule for most new sites.

Yes, at the ELV and ICT layer: cabling, security, fire interfaces and monitoring for Athens and other sites. Power and cooling design sits with your MEP engineers, and we coordinate the interfaces.

Remote Design Support Coordinated ELV & ICT Deliverables Greece Standards Check BIM & CAD Documentation
Market Context

The Greece Data Centre Market

Athens is Greece's main data centre hub, with most operating facilities and the largest upcoming pipeline. Power availability sets the schedule for most new sites.

Greece transposed NIS2 through Law 5160/2024, which gives the National Cybersecurity Authority the central role and requires a security officer, a cybersecurity policy and an asset inventory. Deadlines differ by entity type and were revised, so check the current NCSA guidance.

Design Scope

Data Centre ELV & ICT Design Scope

Scope is agreed against the data centre brief and the appointed consultant's design criteria, not a fixed package.

Structured cabling and diverse routes
Main, horizontal and zone distribution, fibre backbones, and separate routes where the resilience target requires them.
Rack, cabinet & containment layouts
Rack elevations, containment routes, and separation between power and data paths within the hall.
CCTV, access control & perimeter
Perimeter, hall and white-space coverage, with access control zones for machine rooms, plant areas and staff entry.
Fire detection interfaces
Early smoke detection, alarm zoning and interfaces with suppression systems where the project specifies them.
Cooling & environmental monitoring
Sensor and control points for cooling plant, temperature, humidity and leak detection, integrated to the BMS or DCIM platform.
Power and energy monitoring
Metering and monitoring points that show power use and support capacity planning as the facility grows.
Sector FAQs

Data Centre Design FAQs — Greece

Our core scope is the ELV and ICT layers: cabling, security, fire detection interfaces, AV and monitoring. Mechanical and electrical power design is by your MEP and electrical engineers, and we coordinate the interfaces with them.
Yes, at the ELV and ICT layer. We design cabling, security and monitoring redundancy to the targets you confirm. We do not certify a facility against any tier or standard.
We design the metering, BMS data points and network paths that support the energy reporting that applies in Greece. The reporting duty and the data definitions come from the operator and the applicable rules.